Airbus A350 XWB Test Stand, Germany
Erding, Tyskland

  • Approval tests on the new wide-bodied Airbus A350 XWB in a specially erected testing facility
  • Scaffold solution for test preparations as well as continuous measurement and inspection work
  • Time-consuming fatigue tests on the fuselage and wings through a simulation of 86,400 flights (equivalent to three times the expected service life) within a period of 2-3 years
  • Two different endurance tests: EF-2 test (middle fuselage section including centre wing box and both wings) and EW test (systematic application of stress on the wing up to the analytical breaking load point)


Client: IABG Industrieanlagen-Betriebsgesellschaft mbH, Ottobrunn

Scaffold Contractor: Kerscher Gerüstbau, Atting/Rinkam

Lokasjon
Type prosjekt
Industribygg
  • ##project.benefits.item.headline##
    Optimal adjustment of the working levels required for the fuselage and wings – whilst taking into account the steel and hydraulic constructions as well as ensuring that all access points were kept clear
  • ##project.benefits.item.headline##
    Modifications with system components in 25-cm increments – without any time-consuming tube-and-coupler assembly
  • ##project.benefits.item.headline##
    Reduced surface weight
  • ##project.benefits.item.headline##
    System combination of PERI UP with VARIOKIT

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Michael Stodt
Head of Aircraft Structural Testing at IBAG
The recipe for success is the modularity and adaptability of the PERI UP scaffolding system – as well as the combinability with other products in the PERI portfolio. Furthermore, the project support provided by the PERI engineers was very professional and extremely positive.

Relaterte produkter

##SalesContactsSectionHeadline##

Ring oss gjerne på +47 32 20 49 40 eller kontakt en av våre selgere.