Waldschlösschenbrücke, Germany
Dresden, Tyskland

  • arched bridge over the river Elbe
  • structure: arched bridge with four lanes, plus pedestrian and cycle paths
  • superstructure in steel composite construction method
  • overall length: 635 m
  • standard cross-section width: 28 m
  • span of steel arches: 148 m
  • construction period: 2007 – 2012


ARGE Ingenieurbau Waldschlösschenbrücke;
Sächsische Bau GmbH, Dresden and EUROVIA Beton GmbH, Oebisfelde

Lokasjon
  • ##project.benefits.item.headline##
    cost-effective solution with system components
  • ##project.benefits.item.headline##
    fast construction progress without structural alteration works
  • ##project.benefits.item.headline##
    only two different standard formwork units despite the geometrical changes of the superstructure

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Michael Wothe
Project leader
PERI offered us the most coherent approach for the superstructure formwork, tailor-made for the given bridge geometry. The formwork suggestions were already very detailed during the tender stage. Taking into consideration the local conditions, the VARIOKIT substructure meant the best option for us. This could be smoothly adjusted to any local circumstances.