Stanari Thermal Power Plant, Bosnia and Herzegovina
Doboj, Bosnia-Hercegovina

  • Realization of 9 massive concrete piers for the platform supporting the power plant condenser
  • Construction of the turbine building with a 30.50 m x 12.00 m base area and height of 16.90 m


  • DOO "MD-Perić Company”, Bijeljina, Bosnia-Herzegovina (Platform for the Condensator)
  • GP Gradip AD, Prnjavor, Bosnia-Herzegovina (Turbine Building)
Lokasjon
Type prosjekt
Industribygg
  • ##project.benefits.item.headline##
    Climbing units consisting of brackets and wall formwork which can be quickly moved by crane
  • ##project.benefits.item.headline##
    Optimally adapted shoring with minimum material use
  • ##project.benefits.item.headline##
    Cost effective solution thanks to the use of rentable system components
  • ##project.benefits.item.headline##
    Large quantities of materials, technical planning and on site support from one source

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Luka Popržen
Project Manager for the Construction Phase (MD-Perić Company)
PERI developed a safe and fast formwork solution for us. The simple technical solution and the excellent assembly plans have helped us extremely well in efficiently implementing the formwork and concreting work. The continuous technical support has also been particularly helpful, and has simplified our operations.