Mur Bridge S 35, Austria
Frohnleiten, Østerrike

  • 406 m long and 11.75 m wide pre-stressed concrete bridge with T-beam cross-section
  • New bridge construction replaces the existing bridge as part of the S35 motorway modernization project between the Bruck/Mur and Graz intersections


Contractor:
Strabag/Habau Consortium

Scaffolding Contractor:
XERVON Austria GmbH, Maria Lanzendorf

Field Service:
PERI Nußdorf, Austria and PERI Weissenhorn, Germany

Lokasjon
  • ##project.benefits.item.headline##
    Maintaining the construction schedule through the rapid availability of materials and short assembly times
  • ##project.benefits.item.headline##
    High load-bearing capacity of the VRB heavy-duty truss with comparably low deadweight
  • ##project.benefits.item.headline##
    Easy assembly due to simple alignment of the pairs of trusses and high degree of accuracy
  • ##project.benefits.item.headline##
    Time and cost savings during lifting operations due to the low weight

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Heimo Egger
Assembly Supervisor
The VARIOKIT heavy-duty truss system with the variable starting frame has set new standards in shoring operations. It reduces the amount of assembly work required especially for inclined supporting structures. The accuracy of fit as well as aligning the pairs of trusses also make a convincing case.