Motorway bridge over the Drava, Croatia
Osijek, Kroatia

  • New construction of a 2,485 m long bridge as part of the A5 motorway development in eastern Croatia, consisting of one suspension bridge and approach bridges in the flood area of the River Drava.
     
  • Two foreland bridges each approx. 1,000 m long, designed as beam bridges each with 35 m span widths
  • construction with pre-fabricated pre-stressed concrete beams
  • supported on circular reinforced concrete piers with 180 cm diameters and mushroom-shaped heads.
     
  • Cable-stay bridge with 3 segments (100 m / 220 m / 100m spans), suspended on two A-shaped pylons with heights of 75 m
  • carriageway realized using a steel composite construction.


Superstructure and columns for the foreland bridges
Skladgradnja d.o.o. Split

Pylons
Viadukt d.d. Zagreb

Lokasjon
  • ##project.benefits.item.headline##
    adaptability to all technical requirements
  • ##project.benefits.item.headline##
    fast and simple assembly as well as operations
  • ##project.benefits.item.headline##
    use of rentable system components

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Ante Sabljić
Site Manager
As has been the case for many years, PERI has also provided us with reliable support during this project. The VARIOKIT solution perfectly combines functionality, flexibility, reliability and faster assembly. With the quickly understood, practical solutions, we can optimally fulfil all technical requirements of the project. As usual, the PERI solution takes into account all required details.