Lötschberg Tunnel, Switzerland
Mitholz, Sveits

35 km railway tunnel in mining construction technique. The mining-type tunnel driving with a total of almost 16 million tons of excavated material was carried out with tunnel drilling machines (20%), and 80% was blown up.

Construction time until commissioning: 1999 - 2007



Schweizer Alp Transit Consortium (SATCO)

Lokasjon

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Albin Matschek
Site Supervisor
PERI offered the most efficient solution for our jobsite. The adaptable PERI modular construction kit for the jobsite with pre-assembled units excellently fulfilled all our requirements.