Chachenka Motorway Bridge, Russian Federation
Moscow, Russland

Design: Motorway Bridge
Lenght: 550m



Contractor
«SGC Autostrada»

Field Service
PERI Russia, Noginsk/Moscow, PERI Poland Sp. z o.o., Warsaw 

Lokasjon
  • ##project.benefits.item.headline##
    Safe working platforms and access means through an ideal combination of VARIOKIT Balanced Cantilever Equipment and PERI UP modular scaffolding
  • ##project.benefits.item.headline##
    Easy operational handling of the balanced cantilever equipment due to the integrated, centrally controlled mechanical system with hydraulic cylinders as well as lifting and moving devices for moving, lowering, lifting and pre-stressing of the carriage and formwork
  • ##project.benefits.item.headline##
    Assembly on the construction site was carried out in the shortest possible time
  • ##project.benefits.item.headline##
    Shuttering and striking as well as moving from cycle to cycle with only 6 men

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Konnyh Aleksandr Andreevich | Zamaletdinov Fatih Nailovich
Head of Production and Engineering | Site Manager
With the VARIOKIT cantilevered construction carriage from PERI, we could safely realize the superstructure sections as well as in the planned working rhythm. On-site assembly also took place in a very short time.