Bridge renovation Ponte Rio Tua, Portugal
Vila Real, Portugal

Renovation of the 70-year old and 120m long arched bridge over the Rio Tua

Length: 120 m
Width of arch span: 80 m
construction period: 2009



Conduril S.A., Ermesinde

Lokasjon
Type prosjekt
Rehabilitering, Ombygging og Tilbygg (ROT)
  • ##project.benefits.item.headline##
    finished before scheduled construction time
  • ##project.benefits.item.headline##
    fast erection
  • ##project.benefits.item.headline##
    high load-bearing capacity
  • ##project.benefits.item.headline##
    flexible possibilities for adjustments

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

Bernardo Carmo
Construction Manager
In addition to the fast erection, PERI UP offers a high load-bearing capacity. Therefore it was also possible to work on the platforms with heavy material, a crane was not necessary. The scaffolding system was also so flexible that unforeseen adjustments due to inaccurate plans of the structure had no negative impact on the scaffolding solution and the construction sequence.

Relaterte produkter

##SalesContactsSectionHeadline##

Ring oss gjerne på +47 32 20 49 40 eller kontakt en av våre selgere.