Cuatro Torres Business Area, Spain
Madrid, Spania

Three of four high-rise buildings (skyscrapers):

  • Torre Espacio: 223 m high, 57 floors, completion 2007
  • Torre de Cristal: 249 m high, 52 floors, completion 2008
  • Torre Caja Madrid: 250 m high, 45 floors, completion 2009


  • OHL Group, Madrid (Torre Espacio)
  • Dragados (Torre de Cristal)
  • ARGE Torre 1, FCC/Dragados (Torre Caja Madrid)
Lokasjon
  • ##project.benefits.item.headline##
    adherence to the tight schedule
  • ##project.benefits.item.headline##
    system solution for the different requirements of the project

Prosjektet

Bilder fra prosjektprosessen

##project.requirementsAndSolutions.headline##

The formwork solution developed by PERI and the ACS self-climbing system function excellently. Once again, PERI has proven its strengths regarding quality and service. Due to the use of the ACS and SKYDECK systems, our site is a prime example of efficiency and safety. From the beginning, our cooperation with PERI has been outstanding. And with TRIO, PERI UP, SKYDECK and ACS we were able utilise high-performing systems. Here PERI has once again proven its leading position.
Rafael Ruiz | Luis Redondo | José Luis Martín
Site Manager Torre Repsol | Site Manager Torre de Cristal | Site Manager Torre Espacio