PERI system, brukt på byggeplassen

GT 24

Slab box-outs – the so-called “sheds” – are formed with TRIO elements on the slab formwork. They increase tunnel safety operations in the entrance and exit areas.

S1 Tunnel Rannersdorf, Austria

The expansion of the former B 301 Suedrand Street as an expressway connecting the A2 and A4 motorways will considerably ease the traffic situation in the southern districts of Vienna.
PERI formwork carriage solution based on standard components for concreting the 48 m long breakdown bay section in the Herzogberg Tunnel on the A2 motorway in Austria. (Photo: PERI GmbH Weissenhorn)

Herzogberg Tunnel, A2 Motorway, Austria

The A2 motorway runs through a mountainous terrain and required a number of civil engineering structures along its route.

New Terminal 3, Stuttgart Airport, Germany

Since the beginning of the 90s, the annual number of air passengers in and out of the Baden-Wuerttemberg state capital has almost doubled.
Virtually the whole PERI range of formwork and scaffolding is being used here for a multiplicity of applications.

Berlin''s Potsdam Square, Berlin, Germany

Famous buildings, like the Fürstenhof and Esplanade Hotels, once well known historical meeting locations, made the Potsdamer Platz renown as a place of renewal and change.��
Schleifenstrasse Tunnel, Augsburg, Germany

Schleifenstrasse Tunnel, Augsburg, Germany

As part of the B 17 national highway, the Schleifenstrasse ring road has considerably eased the congestion in the centre of Augsburg and thus increased the quality of residential life in the area.
 Side:  2