PERI system, brukt på byggeplassen

TRIO

The MULTIPROP system is so versatile it can be used as individual props, or connected with MRK frames to form tables or towers. The towers are quickly preassembled lying flat, and erected in a single lift with the crane.

Volksbank Building in Wiesloch, Germany

This new multilevel bank building is characterized by open spaces extending three stories. The upper floors‘ structure consists of circular columns and flat slabs open to the outside.
Federal Detention Center, Philadelphia, PA, USA

Federal Detention Center, Philadelphia, PA, USA

The new 12 story detention center, located in downtown Philadelphia will provide 750 beds for short term holdings.
Colton WWTP, Colton, CA, USA

Colton WWTP, Colton, CA, USA

The Colton WWTP in Colton, CA was upgraded in summer 1998. The primary upgrade was the addition of two reinforced concrete race-track style aeration basins and circular clarifiers.
17''8

Fish Creek WWTP, Akron, OH, USA

The Fish Creek Wastewater
Treatment Plant Project of Akron Ohio encompassed 120,000 sqft (11,150 m²) of cast in place concrete walls.
Virtually the whole PERI range of formwork and scaffolding is being used here for a multiplicity of applications.

Berlin''s Potsdam Square, Berlin, Germany

Famous buildings, like the Fürstenhof and Esplanade Hotels, once well known historical meeting locations, made the Potsdamer Platz renown as a place of renewal and change.��