With the realisation of the exhibition centre project in the Gran Bilbao business park area of Barakaldo, approx. 120,000 m² of exhibition space was created.
CTRL Contract 240, Barrington Road Vent Shaft, Barking, East London, United Kingdom
The construction of twin-bore running tunnels, 4.7 km long, together with ventilation shafts and headhouses located at Barrington Road and Woodgate Road forms part of the £7bn Channel Tunnel Rail Link project.
Malt Silo, Vitry le François, France
The construction of this circular malt silo with a 35 m diameter presented the contractors with tough challenges with regards to the concrete surface quality and tight schedule.
75% saving of time for the erection of shaft formwork: 1.30 x 1.30 m TRIO TSE 330 shaft panel
During the reconstruction of a residence hall, an elevator shaft with a clear opening of 2.20 x 2.88 m had to be built.
1 King Street West, Toronto, ON, Canada
The 51 story residential tower on 1 King Street West in Toronto, Ontario will be a display of engineering achievement along with classic historical design once completed.