PERI system, brukt på byggeplassen

TRIO

Exhibition Centre, Bilbao, Spain

Exhibition Centre, Bilbao, Spain

With the realisation of the exhibition centre project in the Gran Bilbao business park area of Barakaldo, approx. 120,000 m² of exhibition space was created.
HD 200 props at 400 mm centres form a temporary wall.

CTRL Contract 240, Barrington Road Vent Shaft, Barking, East London, United Kingdom

The construction of twin-bore running tunnels, 4.7 km long, together with ventilation shafts and headhouses located at Barrington Road and Woodgate Road forms part of the £7bn Channel Tunnel Rail Link project.
Malt Silo, Vitry le François, France

Malt Silo, Vitry le François, France

The construction of this circular malt silo with a 35 m diameter presented the contractors with tough challenges with regards to the concrete surface quality and tight schedule.
TRIO TSE 330 shaft panel

75% saving of time for the erection of shaft formwork:
1.30 x 1.30 m TRIO TSE 330 shaft panel

During the reconstruction of a residence hall, an elevator shaft with a clear opening of 2.20 x 2.88 m had to be built.
UNIPORTAL Tables were supplied to the site pre-assembled. The only requirement for the contractor was to simply connect the MULTIPROP to the table form, thereby again minimizing the space requirement for equipment storage.

1 King Street West, Toronto, ON, Canada

The 51 story residential tower on 1 King Street West in Toronto, Ontario will be a display of engineering achievement along with classic historical design once completed.