Sports hall, Aarhus, Denmark A 4,500 m² working platform was constructed to assemble the 3-D steel truss roof of the new sports hall in Aarhus.
Bank building, Friedrichshafen, Germany Tight fitting working platforms can be constructed using PERI UP Rosett.
PERI UP Rosett suspended scaffold One of the advantages of the PERI UP scaffolding kit can be seen with suspended scaffolds.
Hotel Poznan, Poznan, Poland For the renovation and insulation of the 51.00 m high hotel complex the erection of the facade scaffold was not possible off the low level roofs.��
Land registry, New-Ulm, Germany Where installing ties proves too costly or where the number and position of the ties is restricted the stability of the scaffold can be improved by consideration of the scaffold requirements. This can be incorporated in the design of the scaffold.��