Industribygg

Power Station Chimney, Piacenza, Italy For producing electrical energy the town of Piacenza invested in a power station plant that will burn waste products.
Water Reservoir, Aprilia, Italy During the construction of this drinking water container of 3,000 m³ capacity, the use of the PERI systems allowed optimum adjustment to the geometry of the building construction.
New ZEPPELIN Branch, Weissenhorn, Germany The new ZEPPELIN Branch in Weissenhorn is a sample for future sales centres of the construction machinery trading company.
Project Spider, Rugby, United Kindom One of the largest distribution centres in Europe has been constructed with an area of more than 60,000 m² at the new Central Park industrial facility at Rugby.
Production Shop, Riedlingen, Germany PERI provided the formwork and supporting scaffolding on a day to day basis, so that the work could be started in the shortest possible time after the order was received.
 Side:  6