The construction of this circular malt silo with a 35 m diameter presented the contractors with tough challenges with regards to the concrete surface quality and tight schedule.
In a construction time of only six months, the operators (Fellhornbahn GmbH) succeeded in replacing two ski tow facilities with a six-person chair lift known as the “See-Eck-Bahn”.
The National Ignition Facility (NIF), a $1.2-billion laser facility the size of a football stadium will be the latest in a series of high-power laser facilities used for research in internal confinement fusion (ICF).
The ever rising demand as a result of population and economic growth led Neckarwerke AG to extend the Altbach-Plochingen combined heating and power station.