Safe transfer of high loads from great heights with the MULTIPROP system
The largest property project of the new century so far was constructed between the West railway terminal and Ferdinand bridge in Budapest. The multi-storey car park and the so called Promenade were to be constructed over an area of 34,000 m² in a construction time of 12 weeks. As for the main building, this building was also to be carried out in a mixed construction of in situ concrete and partially prefabricated components.
The product advantages of the MULTIPROP system were quickly shown here. Quickly adjusted to each of the requirements, whether square or rectangular grids, loads of up to 90 kN per leg can be transferred to the substructure with adequate safety reserves, to economically construct the massive beams.