Mudplant Den Helder



In the seaharbour of Den Helder, The Netherlands, is beiing build on a big "Mud plant". This means that drill fluid coming from the oil platforms on the sea will be stored and filtered here in the nearby future. There will also be a storage for drinking water.

This yard will become the most modern docking harbour for suppliers in the offshore branche. This plant has to be build very quickly, almost in an impossible period, to get the yard working in time.

The plant will become a big box of 37,2 x 36,2 meters.
The walls of 70 cm thick and 7 meters high are poored in one time. That meant a use of ca. 2100 m² Trio formwork and 750 m³ concrete.
Due to hard work and a very fast TRIO formwork system the contractor manages to build the walls in just a few weeks time.

PERI system, brukt på byggeplassen
  • TRIO
  • TRIO 330
  • C. Koehoorn, Site Manager
    "It is a great formwork system, the TRIO. Although it is the first time we work with it we managed to build it up in a very short time. It was just what we needed in this hasty project."
    Contractor: Oosterhof-Holman Beton en Waterbouw B.V., Harlingen The Netherlands
    Field Service: PERI B.V., The Netherlands
    Sales Engineer: Alwin de Bondt
    Design Engineer: Harold Arts