One of the advantages of the PERI UP scaffolding kit can be seen with suspended scaffolds: Exactly the same components as for a shoring or a working scaffold are used to create a suspended scaffold-bolting the verticals allows a safe working load in tension of 30 kN.
For the scaffolder this reduces dramatically the number of components and hence the time to erect.
Mobile suspended scaffolds are most cost effective on long sections. All suspended scaffolds demand careful and precise planning to ensure the minimum amount of scaffold material being used and ease of movement.
Quality control tests during production guarantee the grimped end connection on the standard. This ensures that clients can use standard material for suspended scaffolds.