The World Trade Center, Boston, MA, USA



Beams and Slabs poured monolithically with PERI SKYDECK

S&F Concrete of Hudson, MA is constructing Boston´s new World Trade Center. They have chosen PERI to supply 85,000 sqft (7,896 m²) of SKYDECK panels, main beams, MRK braces and accessories, as well as 15,000 various size MULTIPROPs.

In the garage area of the building, there are three levels of 70,000 sqft (6,503 m²), two levels of 55,000 sqft (5,110 m²) and two levels of 50,000 sqft (4,645 m²) totalling 420,000 sqft (39,018 m²) of poured in place concrete. In only three months the SKYDECK enabled the contractor to pour approximately 40 % of the slabs.

Sloping slabs and beams were formed simultaneously and were poured monolithically. This solution greatly reduced the time required for the labor intensive stripping procedure.

PERI system, brukt på byggeplassen
  • SKYDECK dekkeforskaling
  • Contractor: S&F Concrete, Hudson, MA
    Field Service: PERI Baltimore, PERI Boston
    Avdeling: PERI Formwork Systems, Inc., USA
    PERI scope, 1/1998