Torpharm Expansion II, Toronto, ON, Canada
PERI''s Large Range of Product Allows Client to Achieve Schedule
The Torpharm Expansion project was scheduled for completion 11 months after starting. In order to achieve this milestone, Hardrock Forming Ltd. used a large range of PERI formwork. The demanding schedule required a forming system that would satisfy all of the client''s needs regarding cost and efficiency. PERI was able to supply these solutions, whereby conventional forming systems would have failed.
Approximately 24,000 sqft (2,230 m²) of TRIO wall panels and 48,000 sqft (4,460 m²) of the light-weight and easy to erect SKYDECK Slab Forming System was used for the expansion of the Pharmaceutical facility. Other product ranges included UNIPORTAL tables, KG climbing brackets and TRIO column panels. With such a broad range of equipment, PERI provided the client with over 1,000 hours of engineering to ensure a maximum production rate of concrete placement could be achieved.
Source: PERI scope 1/2003��
|
| PERI system, brukt på byggeplassen |
SKYDECK dekkeforskaling
TRIO TRS Søyleforskaling
|
|
|
|