Philadelphia Eagles Football Stadium, Philadelphia, PA, USA
Tabilized Slab and Beam System Saved Time and Money
Madison Construction is the concrete contractor responsible for placing nearly 60,000 yd³ (45,876 m³) of concrete required for this project. The main concourse level consisted of 360,000 sqft (33,444 m²) of slab and beam 24 ft (7.32 m) above ground level.
PERI combined the easy to assemble MULTIPROP system with MULTIFLEX and TRIO panels for an efficient solution. For this site 26 ft (7.92 m) long by 22 ft (6.71 m) high towers (including beam soffit and side) were used. This complete system prevented expensive wooden solutions on site. The advantage of the MULTIPROP towers was that they could easily be moved from one pour to the next in complete units using the PERI Trolley.