PERI UP Rosett is fast to assemble and offers high load carrying ability
The restoration of the masonry of the Old City Hall has been ongoing for the past two years and will continue for the next 2-3 years.
As is required on most restoration projects the scaffold had to allow pedestrian traffic to pass direct under scaffold. In addition the entire scaffold had to be enclosed and capable of retaining heat during the winter months. The facade has many large stone weighing as 1500.00 lbs (681KG) that are removed, lowered to the ground and restored to their original appearance.
The PERI UP ROSETT system provided solutions to all the difficulties of the restoration process.