Broer

       1 | 2 | 3 | 4 | 5 | 6 | 7 | 8      

Swietokrzyski Bridge, Warsaw, Poland - Part 2

The 30.80 m wide roadway slab could be concreted in one pour with the mobile PERI formwork carriages. The carriages were each designed to construct 10 m long cycles.