Tunneler

       1 | 2 | 3 | 4 | 5 | 6 | 7 | 8      

Mrázovka Tunnel, Prague Ring Road, Czech Republic

Shoring solution for the tunnel portal formwork. The MULTIPROP system is quick to assemble and designed for individual prop loads of 90 kN.