Tunneler

       1 | 2 | 3 | 4 | 5 | 6      

Denkendorf Tunnel, Nuremberg – Ingolstadt Rail Route, Germany

Fast moving re-shoring: HD 200 heavy duty props arranged on PERI UP Rosett units which form temporary props and are installed immediately after the formwork carriage is moved.