Athens, Greece, Construction for the Olympic Games:

Canoe/Kajak Slalom Centre A reinforced concrete basin forms the basis of an artificial waterway for the 350 m long course. A system of highcapacity pumps provide the necessary water turbulence.
The shoring to erect the formwork for the water-carrying bridge was put together from 299 stacking towers ST 100 with a height of 3.74 m. Accurately-designed and prefabricated VARIO panels were used for the inclining side walls and cantilevers of the complicated cross-section.
Through this, erection times were reduced and the required concrete surfaces realised.