PERI Norge AS, Prosjekter - Warnow Crossing, Rostock, Germany

Tunneler

       1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9      

Warnow Crossing, Rostock, Germany

The concept took into consideration the available crane capacity – the formwork carriages (total weight of 400 t) could be disassembled in 8 t sections in order to be lifted away before the dock is flooded.