PERI Norge AS, Prosjekter - Warnow Crossing, Rostock, Germany

Tunneler

       1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9      

Warnow Crossing, Rostock, Germany

Tunnel construction was carried out using the
“floating and sinking” method.
Tunnel construction phases:

Construction
In cycle lengths of between 14.20 m and 15.60 m, two 120 m long segments were built.
(Grafik: Bertholdt, Rostock)